Unit 1: Material
Work with materials
- Describe a material
- Give a first overview on the material
Assign documents and classify materials
- Maintain prerequisites for creating material
- Create materials using different methods
Assigning Documents
Classifying Material
- Classify a material with different scenarios
Manage materials
- Manage Materials
- Define a material status
Work with product master
- Work with Product Master
- Benefit from the UI of the Product Master
Unit 2: Bills of Material (BOMs)
Introducing Bills of Material (BOMs)
- Give an overview on material BOMs
- Define the prerequisites
- Work with the BOM structure
Managing BOMs
- Create and change material BOMs
- Work with group and plant specific BOMs
Performing Mass Changes
- Perform mass changes
- Work with the product structure and material BOM browser
Work with material BOMs
Mass changes and browser
Analyze BOMs
- Perform a BOM explosion
- Check in which BOMs materials are used
- Execute a BOM comparison
Unit 3: Work Centers
- Work with work centers
- Create capacities for a work center
Unit 4: Task Lists
Working with Task Lists
- Explain task lists
- Create the first routings
Explain the structure of a task list
Create material assignments and component allocations
- Create material assignments
- Perform a component allocation
Create sub-operations and user-defined fields
- Create suboperations and user-defined fields
Create product versions
Create production resources and tools (PRTs)
- Create production resources and tools
Analyze and change task lists
- Analyze and change task lists
Work with the Engineering Workbench
- Work with the Engineering Workbench
Unit 5: Advanced Bill of Material Functions
- Describe phantom assemblies
- Create Co- Products and By-Products
- Creating Alternative Components
- Create multiple and variant BOMs
- Change BOMs with change Engineering Change Management
- Give an overview of Engineering Change Management
- Work with a change master
- Change material BOMs with a change master
Unit 6: Advanced Routing Functions
Model sequences
- Work with parallel and alternative sequences
Modeling alternative manufacturing processes
- Create alternative routings and production versions
Creating reference operation sets
- Create reference operation sets
Apply lead-time Scheduling and update a material
- Apply lead-time scheduling to update the material
Schedule time elements and reduction in the Routing
- Work with time elements
- Perform a time reduction inside routing
Change Routings with Engineering Change Management
Unit 7: Appendix
Customizing
- Customize master data
- Create a plant in SAP ERP
- Create a storage location
- Work with MRP areas
Material
- Describe material: additional infor
Routing
- Create trigger points
- Use scrap inside material, material BOMs and routings