Unit 1: Master Data for Production
Accessing and Creating Types of Data
- Navigate to configuration data
- Access master data
- Create transactional data
Using Organizational Elements and Master Data in Production
- Describe the relationship between organizational elements and production master data
- Explain how master data objects are used in production planning
Unit 2: Organizational Data in Supply Chain Management
- Creating a Plant in SAP ERP
- Creating a Storage Location in SAP ERP
- Creating MRP Areas
Unit 3: Material Masters
- Describing the Structure of the Material Master Record
- Maintaining Prerequisites for Creating Material Master Records
- Creating a Material Master Record
- Classifying Material Master Records
- Managing the Material Master Record
Unit 4: Bills of Material (BOMs)
- Describing the Structure of a BOM
- Managing the Validity of BOMs
- Managing BOMs
- Changing BOMs with Engineering Change Management (ECM)
- Analyzing BOMs
- Configuring BOMs
- Configure bills of material
Unit 5: Modeling the Manufacturing Process
- Explaining the Structure of Master Data
- Describe the structure of master data used to model manufacturing
- Creating Work Centers
- Creating Capacities in a Work Center
- Integrating Costing with a Work Center
Unit 6: Task Lists
- Explaining the Structure of a Task List
- Describe the structure of the task list
- Creating Material Assignments and Component Allocations
- Creating Suboperations and User-Defined Fields
- Analyzing and Changing Task Lists
Unit 7: Advanced Bill of Material Functions
- Creating Co-Products and By-Products
- Describing Phantom Assemblies
- Creating Alternative Components
- Creating Multiple BOMs
- Creating Variant BOMs
- Making Mass Change with the Product Structure Browser
Unit 8: Advanced Routing Functions
Modeling Complex and Flexible Manufacturing
- Create alternative and parallel sequences
Modeling Alternative Manufacturing Processes
- Create alternative routings and production versions
Creating Reference Operation Sets
Applying Lead-Time Scheduling to Update a Material Master Record
- Use lead-time scheduling to update the material master
Scheduling Time Elements and Reduction in the Routing
Creating Trigger Points
Allowing for Scrap in the Routing
Creating Production Resources and Tools
Unit 9: Alternative User Interfaces
- Describing the Structure of the Engineering Workbench
- Setting the Work Area, Selection Criteria, and Effectivity Window
- Navigating in the Engineering Workbench (EWB)
- Creating Engineering Workbench Work Areas
- Explaining the PLM Web User Interface (Product Lifecycle Management Web User Interface)
- Explaining Status and Action Management (SAM)
- Synchronizing BOMs Using Guided Structure Synchronization
- Tracking Changes in BOMs Using Redlining