Close
COURSE LIST / SECURITY

S4525 - Consumption-Based Planning and Forecasting in SAP S/4HANA

Course Summary:

Course level: Advanced - Details, Configuration & Transaction Course based on software release: SAP S/4HANA 2022 Goals: • Explain the material requirements planning (MRP) process. • Use different consumption based MRP procedures. • Describe and execute forecasting

Course Duration: 2 days


Course Content:

Unit 1: Introduction to Consumption-Based Planning

Introducing Material Requirements Planning (MRP) Process

  • Explain the function and results of MRP and define the prerequisites

Outlining MRP Procedures

  • Outline the different MRP procedures

Unit 2: General Configuration

Defining Planning Levels

  • Define MRP areas

Maintaining and Configuring Material Master Data

  • Get an overview of material master data for consumption-based planning
  • Get to know MRP type and related fields
  • Understand lot-sizing settings
  • Understand and control scheduling

Unit 3: Planning Run Execution

Describing the Planning Run

  • Describe planning run options and their characteristics

Executing a Planning Run Using Classic MRP

  • Parameterize a planning run

Executing a Planning Run Using MRP Live

  • Carry out a planning run using MRP Live

Converting Planned Orders and Evaluating MRP Lists

  • Use the MRP list to verify the planning results and convert planned orders

Evaluating the Planning Results

  • Use the most common planning evaluation tools
  • Use the collective access to lists
  • Use the material tree
  • Use the navigation profile
  • Explore exception messages

Unit 4: Forecast

Explaining Basics of the Forecast

  • Apply the basic settings of forecasting

Executing and Postprocessing the Forecast

  • Execute and postprocess the forecast

Performing Forecast-Based Planning

  • Set up a forecast-based planning process

Performing Time-Phased Planning

  • Set up time-phased planning

Performing Automatic Reorder Point Planning

  • Set up automatic reorder point planning

Unit 5: Source Determination

Explaining Source Determination in Material Requirements Planning

  • Control automatic source determination