Course level: Advanced - Details, Configuration & Transaction Course based on software release: SAP S/4HANA 2022 Goals: • Explain the material requirements planning (MRP) process. • Use different consumption based MRP procedures. • Describe and execute forecasting |
Unit 1: Introduction to Consumption-Based Planning Introducing Material Requirements Planning (MRP) Process
Outlining MRP Procedures
Unit 2: General Configuration Defining Planning Levels
Maintaining and Configuring Material Master Data
Unit 3: Planning Run Execution Describing the Planning Run
Executing a Planning Run Using Classic MRP
Executing a Planning Run Using MRP Live
Converting Planned Orders and Evaluating MRP Lists
Evaluating the Planning Results
Unit 4: Forecast Explaining Basics of the Forecast
Executing and Postprocessing the Forecast
Performing Forecast-Based Planning
Performing Time-Phased Planning
Performing Automatic Reorder Point Planning
Unit 5: Source Determination Explaining Source Determination in Material Requirements Planning
|